Specification guidance for construction
When writing architectural specifications getting the basics in place from the start will help you build a document suitable to your needs. Listed below are some basic rules to follow when writing your next specification:
- Always edit your specification to reflect your appointment and the selected procurement route.
- Always start from a solid baseline document. Do not take the last project you prepared a specification for and change the headers and footers. No matter how vigilant you are, mistakes such as naming the wrong project, specifying incorrect materials and other basic errors will creep into your documents.
- Avoid using the term 'or similar approved' in a specification. If you approve it you are assuming liability for it. Instead use the term ‘or acceptable equivalent’. By accepting an alternative the responsibility for Fitness for Purpose moves to the contractor and the architect's acceptance is for design intent only. If the architect approves, they take back that responsibility. Normally, alternatives are offered for program or cost reasons and the contractor is responsible for the fact that they are providing a different product that must be at least as good quality-wise as the one specified by the architect. If the architect is specifying by description only, the contractor is obliged to provide the technical solution which again they have to be responsible for in terms of quality, performance, appearance and fitness for purpose.
- The proper use of defined terms is important in a specification. Check your contract.
- Document/section identification should appear on every page in the footer for document control purposes.
- Avoid putting specification clause numbers on your drawings. The use of product reference codes is recommended which should all be included on a technical reference sheet (T-Sheet) that links the drawings and the specification. This makes life much easier when changes are required.
- Avoid mixing prescriptive and performance specifications, that is, don’t name a very specific product and then provide performance characteristics for that product – this is not necessary and creates the potential for conflict resulting in claims.
- Avoid specifying temporary works – this is the contractor’s responsibility. Just specify the need to protect adequately, not how to do it.
- Remove names of individuals when specifying products and just provide the company’s details.
- Remove unfinished clauses and terms such as 'if required'. If you are specifying a specific technical solution then you have to specify everything.
- Do not highlight particular clauses by using bold or underlining, as this indicates that the clause is of special importance and there is no such thing in a specification, as by default it indicates that everything else is not so important.
- Always allow time to have your specifications proof-read.
[edit] Related articles on Designing Buildings Wiki
- Bill of quantities.
- Common Arrangement of Work Sections (CAWS).
- Comparison of SMM7 with NRM2.
- Final specifications.
- Insulation specification.
- New Rules of Measurement (NRM)
- Output-based specification.
- Outline specification.
- Performance specification.
- Prescriptive specification.
- Procurement.
- Specification.
- Standard Method of Measurement (SMM7).
- Tender documentation.
- What should be included in a scope of work?
Featured articles and news
Cost-of-living crisis and home improvement plans
Starting on the right footing and top tips for projects.
Delays on construction projects
Types, mitigation and the acceleration of works.
From Chaucer to Fawlty Towers.
Electrotechnical excellence, now open for entries.
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
New project and cultural district described in detail.
The nature of EPCs, crticism and inaccuracies.
History, issues and redesign.
From waste recycling to energy performance the hierchy.
An introduction to WERCS and WEEE responsibilities
Dealing with 2 million tonnes of waste equipment a year.
Global BACS Market: analytics and optimisation
A BSRIA glance at building automation and control systems.
What it is and how to use it.
Types of insulating plaster by binder and insulant.
Investors in People: CIOB achieves gold
Reflecting a commitment to employees and members.
Scratching beneath the surface; a guide to selection.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.